Feature of machine
GLAZING BEAD CUTTING SAW
Automatic 45 degree cutting u-PVC glazing bead profile.
Two glazing beads cutting in one time.
Four pieces saw blade ensure precise cutting, double cutting one each end to mill the hook foot.
Vertical pneumatic clamping device, special designed cutting jig ensure stable positioning.
Precise & easy operated measuring table.
Adjustable cutting speed with regulator on air cylinder.
Adjustable working table to meet different glazing bead.
Universal mould attached to fixed the profile.
Technical Specifications
Power supply |
380V,50-60Hz,3Ph |
Input power |
2*0.75kw |
Spindle rotary speed |
2800r/min |
Air pressure |
0.5~0.8Mpa |
Air consumption |
20L/min |
Depth cutting |
29mm |
Cutting width |
120mm |
Cutting range |
320~1800mm |
Saw blade diameter |
Ø210mm |
Milling cutting diameter |
Ø135mm |
Overall dimension |
1300*700*1350(L*W*H)mm |
Product details
Glazing bead cutting machine, is the basic machine for making upvc windows&doors, here is attached some detailed pictures for your reference to get more knowledges about this machine.
With vertical clamping device.
One times can cut 2 piece glazing bead profile.
There aire 2 pcs motors for glazing bead cutting machine, on each motor there's 1 piece blade and 1 milling cutter.
Packing & Delivery
All the machines will packed according to our company standard to make sure our value customer will receive the machines they ordered intact.
For the hand tools, generally speaking, we will dispatch to customer by international courier (DHL, FEDEX, UPS, EMS).
For whole set up machine, we will packing with wooden case, to protect the machine safely to reach customer factory.
For full container machine order, our factory will load the machine into container and fixed the machinery on the container with iron wire.
Our company will produce the machine according to the order, after finish production and test, will arrange delivery.
Usually we will arrange dispatch within 3-5 working day after receive payment.
If there are big order or customized machines, it will take 10-15 working day.
Related products
Customer Visiting